Early access · Release date: March 24, 2025

Updated

Schedule I Barn Layout: Automation and Storage Guide

Plan your Schedule I barn layout with clear production zones, employee routes, mixing thresholds, and organized storage. Keep every stage moving smoothly.

Jump to
Schedule I Barn Layout: Automation and Storage Guide

How to Arrange the Barn for Automation

Build your Schedule I barn layout around a clear production chain: supplies, growing or processing, mixing, packaging, and finished storage. Keep ingredients beside the stations that use them, leave employee access open, and configure station destinations plus handler routes. Start with one working line before adding a second product.

Arrange equipment in production order so you can follow a batch through the building. Place supply storage beside its assigned work area, keep consecutive mixing stations together, and put finished inventory somewhere you can reach without walking through the production line.

For a cannabis line with two mixing steps, use this sequence:

Production stageInputNext destination
GrowingSeeds and soil from assigned supply storageDrying racks
DryingHarvested productDried-product storage
First mixing stationDried product and first ingredientSecond mixing station
Second mixing stationIntermediate product and second ingredientUnpackaged-product storage
PackagingFinished product and packaging suppliesFinished inventory storage

Keep doorways, station operating positions, and delivery access clear. A machine that fits into a corner still needs an employee who can reach and operate it.

Official page: Schedule I (scheduleonegame.com)

Start With a Manageable Production Module

Use a compact cannabis module to establish the workflow before expanding across the barn:

Schedule I — Start With a Manageable Production ModuleImage: Steam / TVGS

  • 12 moisture-preserving pots.
  • 12 grow lights and 12 suspension racks.
  • 4 drying racks.
  • 2 Mixing Station Mk2 units for a two-step mix.
  • 1 Packaging Station Mk2.
  • Dedicated storage for growing supplies, mixing ingredients, packaging, and finished inventory.

Assign three pots to each drying rack. Split the growing work between two botanists, each handling six pots and two drying racks, with a separate supply rack for each employee.

This arrangement gives you a straightforward set of assignments to inspect. Keep it together as a module rather than scattering its pots and drying racks across the building.

Buy supplies before starting production, and retain cash for wages and replenishment. Equipment alone does not keep an automated line running.

Give Storage a Specific Job

Rename storage and stations with the management clipboard. Use names that identify both the contents and their place in the chain, such as “Growing Supplies,” “Dried Product,” “Mix 1,” and “Packaging Supplies.”

Separate intermediate product from packaged inventory. That makes it easier to spot the exact point where production stops: a full dried-product rack points you toward mixing, while a full unpackaged-product rack points you toward packaging.

Configure Employees, Destinations, and Routes

Automation depends on two separate settings: station destinations move completed output forward, while handler routes supply the transfers that remain.

Schedule I — Configure Employees, Destinations, and RoutesImage: Steam / TVGS

Set both before leaving the property.

  1. Assign employee lockers and provide wages. Give each worker their required assignment and keep their pay funded.
  2. Configure the botanists. Select their supply storage, pots, and drying racks.
  3. Set growing destinations. Send each group of three pots to its drying rack.
  4. Set drying destinations. Send dried product to the storage feeding your mixing line.
  5. Assign the chemist. Connect the first mixer to the second, then send the second mixer’s output to unpackaged-product storage.
  6. Assign the handler to packaging. Set the packaging station’s output destination to finished inventory storage.

For this two-step setup, configure these handler transfers:

  • Dried-product storage → first mixer.
  • First-ingredient storage → first mixer.
  • Second-ingredient storage → second mixer.
  • Unpackaged-product storage → packaging station.
  • Packaging-supply storage → packaging station.

The chemist’s destination settings handle the intermediate transfer between mixers. Avoid assigning an extra route for a transfer already covered by a station destination.

Use one packaging format consistently while establishing the line.

Update Older Floor Plans for Current Mechanics

Several changes affect how tightly you can arrange equipment and how you should configure production.

Schedule I — Update Older Floor Plans for Current MechanicsImage: Steam / TVGS

UpdateRelevant changeLayout or setup action
v0.4.3Storage closets introduced in four sizes at Bagman ICompare closet capacity with existing racks before replacing storage
v0.4.3Mixing Station Mk2 threshold corrected from 10 to 20Review a threshold of 20 when configuring full batches
v0.4.3Mixing Station Mk2 became slightly largerLeave room around the station’s operating position
v0.4.3Employee prompts corrected to require a locker instead of a bedAllocate accessible space for employee lockers
v0.4.4Pot pathfinding obstacles reduced, allowing employees between adjacent potsTest employee access before spreading pots farther apart
v0.4.6Clipboard object selection changed to multi-select by defaultSelect grouped equipment without holding Shift

A higher mixing threshold reduces small batches, but it also requires enough input to begin work. If a mixer waits with product inside, inspect its threshold and ingredient supply before changing the floor plan.

Storage closets offer more item slots than the older racks. Replace storage selectively, then review every supply assignment and destination connected to the objects you changed.

Balance Drying, Mixing, and a Second Product

Drying improves product quality but adds another stage before mixing. Set the desired drying quality deliberately, and check customer standards when deciding how much time to spend on that stage.

Warm temperatures can accelerate plant growth and drying. If you add heating, watch the downstream stations afterward: faster growing does not remove a mixing or packaging bottleneck.

Before expanding, inspect where inventory accumulates:

  • Harvest waiting for drying: review drying capacity and botanist assignments.
  • Dried product waiting in storage: inspect handler transfers, mixer ingredients, and batch thresholds.
  • Intermediate product stuck in a mixer: inspect its destination and the next station.
  • Finished product waiting unpackaged: inspect packaging supplies and handler workload.

Add a second product only after the existing chain completes its transfers reliably. Keep its ingredients, intermediate inventory, and output storage distinct so you can troubleshoot each line independently.

For mushrooms, account for their cooling requirement when placing AC units. Keep their temperature needs separate from areas you intend to warm for plant growth or drying.

Test the Barn Before Leaving It Running

Follow a batch through the entire chain. Watch employees approach equipment, collect supplies, move output, and reach the final storage destination.

Run deliveries during this check, too. The barn received a v0.4.3 fix for delivery vehicles obstructing employee standing positions; keep the unloading area accessible when arranging nearby equipment.

If production stops, check these items in order:

  1. Employee pay and locker assignment.
  2. Available supplies and free destination storage.
  3. Assigned stations and handler routes.
  4. Station output destinations.
  5. Mixing and drying thresholds.
  6. Physical access around the stalled equipment.

After moving or replacing equipment, inspect its connections again. Recheck drying quality settings alongside destinations so the next batch follows the intended process.

If assignments, supplies, and access are correct but an employee remains stuck, save and reload the game, then watch that transfer again before expanding the line.

Official channels for news, updates and player help: